Custom builds · Jackson, MS
Custom restaurant ops software for Jackson operators. Scoped by email. No travel fees.
For restaurant operators in Jackson and the metro running 1 to 30 locations. Five fixed-price builds made from the forms your managers already fill out.
$4,500 per build · $350/mo after handoff · Unlimited locations · Case study (PDF)
No travel line on the invoice
You do not pay for anyone to drive to Jackson.
Consultants who come on site bill for the trip. This process has no trip. You photograph your paper par sheet or checklist, answer about 12 questions by email, and that is the spec. The price is $4,500 flat whether you are 5 minutes or 3 hours away.
Mississippi operators work under federal wage rules, so a big share of front-of-house pay is tips. The tip pool calculator below splits a pool to the penny by hours and role points, and the Par Tracking build keeps counts and order sheets on a phone.
Mississippi wage floor for tipped staff
- Minimum wage
- $7.25
- Tipped cash wage
- $2.13
- Max tip credit
- $5.12
Mississippi has no state minimum wage law, so the federal rates apply. When cash wage is $2.13, a disputed tip-out is a pay problem, not a math problem. Keep a record of every split.
Source: US Department of Labor, state tipped minimum wage table, effective July 1, 2026. Rates change. Confirm with your state before you set pay. This is not legal advice.
Where Jackson operators usually start
Build 3: Par Tracking
Counts from a phone and a generated order sheet catch shortages before the truck, not after.
All five builds are the same flat price: 1. Shift Checklists, 2. Work Orders, 3. Par Tracking, 4. Staff Alerts, 5. Inspections. See what each one does.
From the Work Orders case study. Download the case study and offer (PDF)
Not sure which build? Start free
Send your Jackson location's Google Maps link. Get a one-page Ops Leak Report.
The complaint your guests repeat most, what it plausibly costs a month with the math shown, and which build catches it. By email, within 2 business days.
Questions
What Jackson operators ask
- Do you charge extra because we are out of state?
- No. The price is the same everywhere. All of the work happens by email.
- Our par sheet is handwritten. Is that enough to start?
- Yes. A clear photo of the sheet you use today is exactly what the build brief asks for.
- Can the tip records come out of the system for our accountant?
- Your data is yours. Ask for a full export any time, during the build or after, in a standard format.
- What happens if you stop supporting the build?
- You get 90 days notice and a full export of your data. That is written into the agreement.
Pick the build. That is the whole first step.
Also building for operators in Memphis, TN · Nashville, TN · Little Rock, AR